WPP Yagnilo
The final version of the investment proposal envisages the development and construction of WPP "Yagnilo" consisting of 25 WTGs, located in 6 plots
of land near the village of Yagnilo, Vetrino municipality and villages of Stan and Pamukchii, municipality of Novi Pazar. Detailed planning is
designed for all plots of land with the technical requirements for installing GE 2,5 – 103.
In the process of planning and designing of the project was taken into account two-year data on wind potential and the requirements of the Ministry
of Environment and Water. Birds and bats studies and monitoring were conducted on site, and the results were analyzed and included in the EIA
report. Wind energy yield analyses were made by Wind Prospect-UK, and they show high efficiency and productivity of the park. The micrositing
of wind turbines is consistent with optimal utilization of the wind potential and compliance with environmental and hygiene requirements for distance
to settlements, forests and water basins.
The project strengthens the role of GE Energy and Winslow Energy, as leading companies in the renewable energy sector in the region. GE's wind
turbines will be used for several other projects in the region, including Fantanele project in Romania.
See the project's location map
For additional information, please see: www.winslow-wp.com
|